News
Our Client Company ICA (“IC Astaldi Içtaş”) is a joint Italian-Turkish venture.
ICA is included in the top 100 ranking of “Top World Contractors” (“Engineering News Record”).
This video was added after the completion of the next stage of the construction of the Moscow-St. Petersburg Expressway (M11) on sections of km 543 – km 646 and km 646 – km 684.
Our company supplied spiral metal corrugated pipes to this facility for the arrangement of culverts on the highway.
According to the Sevzapupravtodor, works have been carried out on current and capital repairs of the culvert and the pavement on four federal routes in the North-West region of Russia.
The State Committee for Transport of the Pskov Region reported the following:
So, on the highway Р-56 Veliky Novgorod – Soltsy – Porkhov – Pskov, the movement was limited to the bridge over the Uzu River, km 147 + 746 km 171 + 111. On this site, repair works are carried out to strengthen the embankment and culverts.